EasyManua.ls Logo

JUKI KE-2020 - User Manual

JUKI KE-2020
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...











KE
KEKE
KE‑
‑2010/2020/2030/2040
2010/2020/2030/20402010/2020/2030/2040
2010/2020/2030/2040

INST
INSTINST
INSTALLATION
ALLATIONALLATION
ALLATIONGUIDE
GUIDEGUIDE
GUIDE
JUKICORPORATION
JUKICORPORATIONJUKICORPORATION
JUKICORPORATION
ELECTRONICASSEMBLY&
ELECTRONICASSEMBLY&ELECTRONICASSEMBLY&
ELECTRONICASSEMBLY&
TESTSYSTEMSDIVISION
TESTSYSTEMSDIVISIONTESTSYSTEMSDIVISION
TESTSYSTEMSDIVISION
SMTTRAININGCENTER
SMTTRAININGCENTERSMTTRAININGCENTER
SMTTRAININGCENTER

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the JUKI KE-2020 and is the answer not in the manual?

JUKI KE-2020 Specifications

General IconGeneral
Component Size0402 chip
Board SizeL50 x W50mm to L510 x W460mm
Power Supply50/60 Hz
Air Supply0.5 MPa or more
TypeModular Mounter

Summary

Main Unit Installation

Installation Procedures and Cautions

Outlines steps for installing the main unit, including forklift usage and safety precautions.

Machine Leveling and Height Adjustment

Adjusting KE-2010;2020;2040

Steps to detach covers and air caps before adjusting transport height and leveling for specific models.

Leveling Procedures (KE-2010;2020;2040)

Detailed instructions for leveling the machine using adjusters and a level vial.

Securing Adjustments and Cautions

Locking adjust nuts, tightening bolts, and safety notes for preventing unit movement.

Adjusting KE-2030

Steps to detach covers before adjusting transport height and leveling for the KE-2030 model.

Leveling Procedures and Cautions (KE-2030)

Instructions for leveling the KE-2030 using adjusters and securing bolts with safety notes.

Board Transport Unit Handling

Compressed Air Connection

Connecting Air Tubes and Adjusting Pressure

Instructions for connecting compressed air tubes and setting operating air pressure with cautions.

Power Cord Connection

KE-2010;2020;2040 CE Machine

Steps for connecting the power cord to CE models of KE-2010/2020/2040.

KE-2010;2030 Standard Machine

Procedures for connecting the power cord to standard KE-2010/2030 models.

KE-2010;2020;2040 Standard Machine

Procedures for connecting the power cord to the standard KE-2010/2020/2040 models.

KE-2010;2030 CE Machine

Steps for connecting the power cord to CE models of KE-2010/2030.

External Equipment Interface

Matrix Tray Changer Connection

Pre-Power On Checks

Machine Verification Procedures

Comprehensive checklist for verifying leveling, connections, and smooth movement before powering on.

Feeder Exchange Trolley Adjustment

Caster Plate Mounting Position

Adjusting caster plate position for 2-step height adjustment of the feeder exchange trolley.

Adding Trolley Spacers

Procedure for adding trolley spacers to adjust the height of the feeder exchange trolley.

Related product manuals