EasyManua.ls Logo

JUKI KE-2020 - Board Transport Unit Handling; Transport Rail Packing Removal

JUKI KE-2020
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
KE2000 Installation Manual
20
7. Board transport unit
7-1.Detachingthepackingmaterialsfromthetransportrail
Peel off the filament tapes fixing the rail M and rail F, and detach the air cap put at the center
of the transport rail.
Fig 7−1−1
7-2.DetachingthepackingmaterialsfromtheBUtable
Fig 7−2−1

WARNING
To prevent the body from injury which can be caused by
accidental activation of the machine , cut off the power to the
machine before starting to work.
Filament tape
For only the model KE-2030,
the rail
is separated into four pieces, IN
buffer, IN center station, OUT center
station, and OUT buffer.
Keep the components from contact
with the sensors.
Peel off the filament tapes
fixing
the BU table.
Two BU tables are provided
only on the model KE-2030.
Filament tape

Table of Contents

Related product manuals