11. Install the line cards:
a. Remove the line card cover by grasping the handles and pulling straight out to expose the slot for the line card.
Save the cover.
NOTE: If you are not installing a line card do not remove the line card cover.
b. Slide the line card all the way into the slot unl the handle holes line up.
c. Rotate the handles simultaneously into the chassis unl the card is fully seated and the handles are vercal.
12. Install the opcs and oponal cable management system.
13. Li the front door and line up the capve screws in the door with the holes in the chassis ange.
Aach the door to the chassis and rack using the capve screws. Turn the screws unl they are nger ght.
14. Have a licensed electrician aach the cable lug (provided in the accessory kit) to the grounding cable.
15. Remove the two M6 screws with aached washers below the boom power supply using a Pozidriv or Phillips
screwdriver.
16. Place the chassis grounding lug and cable over the screw holes with the cable connecon poinng to the le. Place
the two screws with aached washers over the grounding lug and grounding cable. Tighten the two M-6 screws
using a Pozidriv or Phillips screwdriver.
6