Start the machine and carry out a trial run
1. Close all access doors, replace and secure all removable panels.
2. Open the user's shut-off valve between the machine and the air distribution network.
3. Switch on the power supply and reset the maintenance interval counter.
4. After approx. 10 minutes of operation: Switch off the machine and check visually for leaks.
10 Maintenance
10.18 Changing the oil separator cartridge
82
Operating Manual Screw Compressor
ASK 901824 12 E