EasyManua.ls Logo

Keiser 3103XX User Manual

Keiser 3103XX
20 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
ASSEMBLY INSTRUCTIONS
3103XX
8-foot ceiling
3104XX
9-foot ceiling
3105XX
8-foot ceiling
3106XX
9-foot ceiling
Height clearance 96 in (2,439 mm) 108 in (2,743 mm) 96 in (2,439 mm) 108 in (2,743 mm)
Footprint (DxW) 61 in x 71 in (1,550 mm x 1,804 mm) 93 in x 71 in (2,362 mm x 1,804 mm)
Insert Platform
conguration (DxW)
- not applicable - 98 in x 71 in (2,489 mm x 1,804 mm)
Olympic Lifting
Insert Platform
conguration (DxW)
138 in x 100 in (3,505 mm x 2,540 mm) 172 in x 100 in (4,369 mm x 2,540 mm)
Free Space
around Equipment
(recommended)
INSTALLATION REQUIREMENTS
Note to Installer: Be sure to leave Assembly Instructions with the customer.
Note to Customer: Keep Assembly Instructions for future reference.
Skill level: Professional installation is required by qualied personnel.
Product failure due to improper installation is not covered under warranty.
READ CAREFULLY. KEEP THESE INSTRUCTIONS.
KEISER CORPORATION
2470 S. Cherry Ave.
Fresno, CA 93706
CUSTOMER SUPPORT
If you have any questions regarding the Assembly Instructions
after reading this guide, contact Keiser Customer Support:
1 559 256 8000
service@keiser.com
keiser.com/support
315503_A
HALF RACK
KEISER STRENGTH
Verify planned equipment location is a solid, level, and structurally sound surface and meets the following dimensions criteria:
MODELS:
3103XX
8-foot ceiling
3104XX
9-foot ceiling
3103XX model 3105XX model
3105XX Long Base
8-foot ceiling
3106XX Long Base
9-foot ceiling
72 inches
(1,829 mm)
Sides* 48 inches
(1,219 mm)
Front 12 inches
(305 mm)
Rear
*Multiple Racks may share side Free Space.
Question and Answer IconNeed help?

Do you have a question about the Keiser 3103XX and is the answer not in the manual?

Keiser 3103XX Specifications

General IconGeneral
BrandKeiser
Model3103XX
CategoryRacks & Stands
LanguageEnglish

Summary

Keiser Strength Half Rack Overview

Available Keiser Half Rack Models

Lists the different Keiser Half Rack models available.

Installation Requirements

Installation Location Criteria

Ensures the location is solid, level, and structurally sound for installation.

General Information

Introduction to Keiser Half Rack

Welcome and overview of the Keiser Half Rack assembly instructions.

Record Your Serial Number

Instructions on how to record the equipment's serial number.

Register Your Product

Guide to registering the product for safety notifications and warranty service.

Important Safety Information

Safety and Serial Number Labels

Information on maintaining and understanding safety and serial number labels.

Safety Conventions and Symbols

Explanation of symbols used in the assembly instructions for warnings and important notes.

Equipment Specifications

Half Rack Size and Weight Specs

Detailed dimensions and weight for each Half Rack model.

Additional Half Rack Specifications

Details on cable resistance, power, and frame finish for all models.

Training Space Requirements

Recommended Clearance for Use

Guidelines for minimum clearance around the equipment for safe training.

Assembly Guide

Preparation Before Assembly

Important preparatory steps before starting the assembly process.

Equipment Anchoring Procedures

Instructions and considerations for securely anchoring the equipment.

Required Tools and Materials

List of tools and materials needed to assemble the Half Rack.

Parts List

Half Rack Component Identification

Visual guide and list of all components included in the Half Rack assembly.

Unpacking Instructions

Unpacking the Half Rack Equipment

Step-by-step guide for safely unpacking the equipment from its shipping crate.

Initial Component Unpacking Steps

Key initial steps for unpacking, including unbolting weight stacks.

Assembly Procedure

Assemble Insert Platform First

Instructions for assembling insert platforms before mounting the Half Rack.

Bottom Frame Placement

Positioning and initial placement of the Half Rack bottom frames.

Install Power Modules and Displays

Power Module and Display Installation

Steps for installing the power modules and connecting the power displays.

Connect Air Lines and Communication Wire

Air Line and Wire Connections

Procedure for connecting pneumatic air lines and communication wires.

Power Display Check and Bench Positioner

Display Check and Bench Positioner Install

Verifying power display connection and installing the bench positioner.

Set Posts and Connect Wire

Post Setup and Wire Connection

Steps for positioning the main posts and connecting communication wiring.

Install Cross Brace and Top Display

Cross Brace and Top Power Display Installation

Instructions for installing the cross brace and the top-mounted power display.

Install Weight Stack

Weight Stack Component Installation

Procedure for installing the weight stack assembly onto the rack.

Final Assembly Steps

Final Tightening and Accessory Setup

Final torqueing of bolts and installation of functional accessories like bar catches.

Air System Setup and Final Checklist

Final Installation Checklist

A comprehensive checklist to confirm all assembly and setup steps are completed correctly.