3.6 Initial lling and pressure test
• Make sure that there are no external materials or soiling in the grease separator.
• Fill the complete grease separator system with water (up to system overow on the outlet <35>).
• Carry out pressure test, to do this
• Open both inspection covers.
• Seal outlet and inlet using suitable means.
• Fill the grease separator system completely with water and make sure there are no leaks.
• Make the inlet and outlet functional again.
The system is now ready to use..
4 Operation / emptying
Workow diagram for emptying cycle (Euro standard 1825
A
Emptying period
B
Disposal vehicle extracts the grease
C
Hot water* feed
D
Cold water feed
* recommended
Abb. [5]