EasyManua.ls Logo

Kessel EasyClean - Initial System Setup and Readiness; Initial Filling and Pressure Testing Procedure

Kessel EasyClean
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36 / 48
Operation / emptying
V 1.0
3.6 Initial lling and pressure test
Make sure that there are no external materials or soiling in the grease separator.
Fill the complete grease separator system with water (up to system overow on the outlet <35>).
Carry out pressure test, to do this
Open both inspection covers.
Seal outlet and inlet using suitable means.
Fill the grease separator system completely with water and make sure there are no leaks.
Make the inlet and outlet functional again.
The system is now ready to use..
4 Operation / emptying
Workow diagram for emptying cycle (Euro standard 1825
A
Emptying period
B
Disposal vehicle extracts the grease
C
Hot water* feed
D
Cold water feed
* recommended
A
B
D
C
Abb. [5]

Table of Contents

Other manuals for Kessel EasyClean