Chapter 4: Preventive maintenance and testing
42 VM-1 User Guide
Frequency Recommended procedure
Semiannually Inspect the equipment for any visible signs of
damage or other changes that may adversely
affect performance. Clean if necessary.
ment Semiannually Inspect the equipment for any visible signs of
damage or other changes that may adversely
affect performance.
Alarm notification appliances
Semiannually Verify that the module’s green LED flashes.
Ensure that there are no changes that may
adversely affect equipment performance.
Supervising station fire alarm
system transmitters
Semiannually Ensure that there are no changes that may
adversely affect equipment performance.
Annually Inspect the equipment for any visible signs of
damage or other changes that may adversely
affect performance.
Fiber optic cable connections
Annually Inspect the cables for any visible signs of
damage, loose connections, or other changes
that may adversely affect performance
Routine maintenance schedule
Routine maintenance and testing should be scheduled for your VM-1 life safety
system in accordance with Table 9 below or more often if required by the local
AHJ.
Note: Only your system service provider or a qualified technician with a complete
understanding of the system hardware and functions should perform system
maintenance and tests.
Table 9: Routine maintenance schedule
Frequency
Quarterly /
Annually
Supervisory signal devices (except valve
tamper switches) Quarterly
-premises transmission equipment Quarterly
Semiannually
Semiannually
Annually
Control unit trouble signals
Annually
Fiber optic cable connections
Annually