Do you have a question about the Kidde Gemini II and is the answer not in the manual?
Brand | Kidde |
---|---|
Model | Gemini II |
Category | Fire Alarms |
Language | English |
Covers warnings and cautions for system installation and setup.
Provides general safety guidelines and precautions for system operation.
Explains warning and caution terminology used in the manual.
Purpose of the chapter and overview of the Gemini II system.
Overview of the Gemini II fire alarm/suppression system.
Discusses hazard analysis procedures relevant to the system.
Details the MCP, its components, and functionalities.
Describes the MCP display interface and its features.
Details power supply and battery backup for the MCP.
Discusses hazard block inputs for the MCP.
Describes the MCP's indicating circuits and their functions.
Details system communication aspects and protocols.
Describes system logs and event recording.
Introduces the Remote Hazard Unit (RHU).
Details power supply and battery backup for the RHU.
Describes the RHU display interface.
Introduces the Remote Display Unit (RDU).
Describes input/output functions for RHU/RDU.
Details RS-485 communication highway.
Lists agency approvals for the system.
Discusses suppression system requirements.
Purpose of the chapter on system operation.
Describes panel controls, indicators, and display.
Explains global and local operating modes.
Guide to interpreting the status display messages.
How to view current alarm and trouble messages.
Procedures for silencing alarms, supervisory, and trouble events.
Describes the function of each LED indicator on the unit.
Navigating the system's menu structure for configuration.
Accessing system lists via the menu.
Procedures for resetting the system and its components.
Explanation of various event messages.
Overview of system operation after initial setup.
Details the logic for agent release initiation.
Describes the manual release function.
Describes the automatic agent release function.
Operation of clustered agent cylinder systems.
Explains the abort function and its various modes.
Purpose of the chapter on scheduled maintenance.
General guidelines for scheduling maintenance.
Describes general maintenance tasks.
Procedure for conducting a walk test.
Procedures for battery maintenance and status checks.
Procedure for testing the LCD and LED indicators.
Information on the MCP's real-time clock backup battery.
Purpose of the chapter on troubleshooting.
Procedure for isolating field devices and output modules.
Details on event messages encountered during troubleshooting.
Purpose of the chapter on parts listing.
Purpose of the chapter on installation and configuration.
Lists environmental, electrical, and material requirements.
General steps for system installation.
Specific procedures for installing system units.
Procedures for wiring hazard blocks and devices.
Steps for configuring system units via MCP.
Basis for calculating battery backup duration.
Lists power consumption of system components.
Calculating standby and alarm power requirements.
Detailed calculations for battery capacity.
Examples of battery capacity calculations.
Lists compatible smoke detectors and accessories.
Lists compatible duct smoke detectors and accessories.
Lists compatible rate compensated heat detectors.
Lists compatible Chemetronics heat detectors.
Lists manual release, abort, and suppression accessories.
Lists compatible agent release control heads and solenoids.
Lists compatible notification appliances and accessories.
Lists other compatible miscellaneous devices.
Lists ULC listed smoke detectors and accessories.
Lists ULC listed notification appliances and accessories.
Factory Mutual guidelines for sprinkler systems.
Describes configuration for central station operation.
Wiring diagram for the Main Control Panel.
Wiring diagram for the Remote Hazard Unit.
Wiring diagram for the Remote Display Unit.
Terminal details for smoke detectors.
Detail of the optional relay board connections.
Configuration of shorting links for MCP and RHU.
Terminal details for release circuits and stop valves.
Diagram detailing battery connections.
Diagram of the RS-485 communications highway.
General information on Canadian system requirements.
Overview of system operation for Canadian systems.
MCP operation specifics for Canadian systems.
RHU operation specifics for Canadian systems.
Installation and configuration for Canadian systems.
Testing procedures for Canadian systems.
Battery calculations for Canadian systems.
Lists compatible devices for Canadian systems.