Do you have a question about the KIRLOSKAR UP 125/30B and is the answer not in the manual?
Model | UP 125/30B |
---|---|
Head | 30 m |
Voltage | 415 V |
Frequency | 50 Hz |
Speed | 2900 RPM |
Phase | 3 |
Explains the pump naming conventions based on type, size, and diameter.
Details the pump's casing, impeller, shaft, sleeves, insert, and bearings.
Provides essential safety guidelines for operating KBL products.
Covers safe methods for transporting and storing the pump unit.
Details procedures for temporary and long-term pump storage.
Outlines the visual inspection procedure upon receiving the pump.
Describes necessary preparation steps before pump installation.
Guides on selecting an optimal location for pump installation.
Specifies requirements for a strong and rigid pump foundation.
Details how to set and level the baseplate for proper alignment.
Steps for applying grout to secure the baseplate and foundation.
Explains the process for aligning pump and driver shafts accurately.
Provides guidelines for correct suction and discharge piping installation.
Lists essential checks before the initial pump startup.
Step-by-step procedure for starting the pump driver and operation.
Describes periodic checks and observations during pump operation.
Details the correct procedure for safely stopping the pump.
Provides specifications and model numbers for pump bearings.
Offers guidance on the proper care and maintenance of bearings.
Explains initial lubrication and re-greasing intervals for bearings.
Details the packing and installation for stuffing boxes.
General instructions for the care and operation of mechanical seals.
Explains Net Positive Suction Head requirements for pump operation.
Lists the maximum forces and moments permitted on pump flanges.
Specifies the nominal bore sizes for suction and delivery pipes.
Details maximum pump speeds and corresponding water fill capacities.
Information on the interchangeability of various pump components.
Safety precautions for environmental, health, and safety during maintenance.
Provides a schedule for regular maintenance checks and tasks.
Step-by-step guide for dismantling the pump for overhaul.
Detailed instructions for reassembling the pump after overhaul.
Advice on choosing the best location for the pump to ensure performance.
Guidance on constructing a stable and rigid foundation for the pump.
Explains the importance and process of aligning pump and driver shafts.
Describes angular and parallel misalignments between shafts.
Steps to level the pump and driver unit on its baseplate.
Procedures for grouting the foundation bolts and baseplate.
Recommendations for proper suction and discharge piping installation.
Details on correct suction pipe layout, material, and installation.
Guidance on installing the discharge piping with necessary valves.