6 Commissioning................................................................. 40
6.1 Activities during commissioning.................................. 40
6.2 Programming the unit................................................. 41
6.2.1 Target temperature.................................................. 41
6.2.1.1 Function of the target temperature....................... 41
6.2.1.2 Displaying and changing the target temperature.. 41
6.2.2 Temperature warning limits...................................... 43
6.2.2.1 Function of the temperature warning limits........... 43
6.2.2.2 Displaying and changing the temperature warning
limits...................................................................... 44
6.3 Instruction and unit handover..................................... 46
6.3.1 Instructing the unit officer......................................... 46
6.3.2 Handing over the unit............................................... 46
7 Operation........................................................................... 47
7.1 Switching on the unit................................................... 47
7.2 Switching off the unit................................................... 47
7.3 Retrieving/erasing the temperature memory.............. 48
7.4 Setting up PC-KIT-NET (optional)............................... 49
7.5 Stocking the unit......................................................... 53
8 Cleaning and disinfection................................................ 56
9 Maintenance...................................................................... 59
9.1 Safety inspection........................................................ 59
10 Alarms................................................................................ 62
10.1 Alarm functions......................................................... 62
10.2 Handling alarms........................................................ 63
11 Status displays and error messages.............................. 64
11.1 Status displays.......................................................... 64
11.2 Error messages......................................................... 64
12 Decommissioning and disposal...................................... 70
12.1 Decommissioning unit............................................... 70
12.2 Disposing of the unit................................................. 70
13 Appendix............................................................................ 72
13.1 Declaration of conformity.......................................... 73
13.2 Technical data........................................................... 75
13.3 Installation drawing................................................... 77
14 Index................................................................................... 78
Table of contents
18.12.2018Refrigerator/freezer BL series6