EasyManua.ls Logo

Kiturami K1-22E - Horizontal Coaxial Flue Fitting

Kiturami K1-22E
55 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
ۣૐ ۞ইૐ઺Ҵ ೠҴ࢑সӏѺ ಿ૕҃৔మ
CAUTION
SUPPORT-Alluesystemmustbesecurelysupportedata
MINIMUMofonceeverymeter&everychangeofdirection.
Itisrecommendedthateverystraightpieceissupported
irrespectiveoflength.Additionalsupportsareavailableas
accessories.
▪Theboilerhasbeenpositionedonthewall,ttheueseal
intotheinternalueturret.
▪Fittheelbowintothetopoftheboilerandrotatetothe
requiredposition.Itispossibletorotatetheelbow360°onits
verticalaxis.
▪Usingtheueclamp,sealsandscrewssuppliedsecurethe
elbowtotheboiler.
▪The1meterhorizontaluekitsuppliedissuitableforanexact
generallydimensionof850mm.
▪Measurethedistancefromthefaceoftheexternalwalltothe
faceoftheueelbow,thismustnowbesubtractedfrom850
mm,nowhavethetotalamounttobecutfromtheplainend
oftheue.
5.5.8FittingtheCoaxialFlue(Ø60/Ø100-HorizontalFlueSystem)
1)ConcentricBend
2) Concentric Terminal
3)InternalWallSealingPlate
4)ExternalWallSealingPlate
▪Cuttheuetotherequiredlengthtakingcarenottocut
theinnerue,nextcuttheinnerueensuringthatthelength
betweentheinnerandouterueismaintained.
▪Ifttingtheuefrominsideofthebuildingattachtheouter
wallsealtotheueterminalandpushtheuethroughhole,
oncethewallsealhaspassedthroughthehole,pulltheue
backuntilthesealisushwiththewall.
▪Shouldtheuerequireextending,theueconnectionsare
pusht,however,
oneuebracketshouldbeusedtosecureeachmeterofue.
▪Anyadditional“inline”bendsintheuesystemmustbe
takenintoconsideration.
▪Theirequivalentlengthsare:
-ConcentricPipes:45°bend1.0meters/90°bend1.5meters
•Installtheconnectingpipewithaminimumfallof3°towards
theboiler.
•Maximumpermissibleequivalentuelengthsarebelow
example.
- C
13
HorizontalFlueSystem
1
2
4
- Calculation C
13
FlueLength
Max.Length=A+B(1X90ºelbow)=20-1.5=18.5M
3
B
A

Related product manuals