7. Commissioning
7.1 Before Commissioning Procedures
Ensurethatthetypeofgasusedcorrespondstoboilersettings.
Openthemainswatersupplytotheboilerandallhotwater
tapstopurgetheDHWsystem.
Checkconnectiontoa230V-50Hzpowermains,correctL-N
polarityandtheearthedconnection.
Ensurethatthemanuallyllingvalveopens,thenopenthe
heatingowandreturnvalvesontheboiler.
Ensurethatthecapontheautomaticairventonthepump
bodyisopened.Ifyouneedmoretotimesave,mightoftenbe
openedforciblysafetyreliefvalve.
Thesystemmustbeushedinaccordancewithproperlylocal
orNationcodes,andtheushingagentmanufacturer’s
instructions.
Pressurizethesystemto1.5bar(Referto‘BasicInformation’-
‘D:WP),thenclosethellingvalve.
Testforgastightness,turnthegassupplyonandpurge
accordingtotherelatedlocalgasapplianceregulations.
7.2 Commissioning Procedure
7.2.1Air-Derationfunction
Thedisplaybacklightremainslitapprox.2minutes.
Ifthebacklightgoesoutduringcommissioningitdoesnot
meanthattheprocesshasbeencompleted.
EnsurethegasisturnedOFF.Turnthepowertotheboiler
ONbymanualswitchundertheboilerorpowerONbutton
fromcontrolpanel.Thesoftwareversionwillbedisplayed.
TheDe-AerationFunctionisnowactivatedwhenrstpower
supplyandlowheatingwaterpressure.
Theboilerpumpwillrunforapprox.25seconds.
Duringthistimethepumpwillalternateonandoffandthe
divertervalvewillswitchbetweenheating&hotwaterto
purgeairfromthesystem.Duringthisfunctionisactivated,
shouldbeopenthellingvalve.
▪Attheendoftheprocesstheboilerwillreturntothe‘Standby’
position.
7.2.2GasSettings
CheckingtheCombustion
- Thepersonwhoiscarryingoutacombustionmeasurement
shouldhavebeenassessedascompetentintheuseofa
uegasanalyzerandtheinterpretationoftheresults.
-Allowthecombustiontostabilizebeforeinsertingthe
CombustionAnalyzerProbeintotheTestPoint.
Thiswillpreventsaturationoftheanalyzer.
Turnonthegasandwatersupplytotheboiler.
Thecombustion(COvalue)mustbemeasuredand
recordedatMAXIMUMDHWinput&MINIMUMinput.
Removetheplugbyrotatingtheplugtoaccessthe
emissionsmonitoringport.Inserttheanalyzerintothe
port.
FlueSamplingPoint
Plug
Analyzer
- MeasuringExhaustFlue
Fullyopenseveralhotwaterxturesandsettheboilerto
operateatmin.inputconditionbymovingDIPswitch#to
OFFposition.
- DIPSwitchLocation
1.No.8:On-Min.
2.No.9:ON-Max
MeasuretheCO2valueatmin.inputcondition.
IftheCO2valueisnotwithin0.5%ofthevaluelistedin
Tablebelow,thegasvalveoffsetscrewwillneedtobe
adjusted.Ifadjustmentisnecessary,locatethesetscrew
asshownhinFigbelow.
Usingaclockwisetoriseorcounterclockwisetolowerthe
CO2value.