EasyManua.ls Logo

Kiturami WORLD PLUS-13D - 3 ) Functions of the Convenient Service; Specification; Test Working

Default Icon
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. TEST WORKING
1). Before switching-on, please check the followings after finishing the installation of boiler, flue, pipes, and electricity.
Is the boiler installed horizontally on the wall?
Does the installer work on the installation manual?
Are not there any inflammable material near the boiler, for example, gasoline, gas can and bottle, thinner, etc ?
Is the on-off valve installed between gas pipe and boiler?
Does check the gas leakage of each connecting points?
Does insulate each pipes properly to protect in winter season?
Does check the leakage of the exhaust gag from the flue ?
Does check the voltage and hertz - AC 230V 50Hz, before of plugging-on ?
Does locate the middle on-off valve for water inlet pipe?
Does check the classification of the supplied gas to the instruction of gas on the specification label in boiler?
3-1 Check list before switching-on
1
2
3
4
7
8
9
10
6
KITURAMI BOILER
WORLD plus
Model : world pluse -13K
world pluse -16K
world pluse -20K
world pluse -25K
world pluse -30K
5
20페이지

Related product manuals