8.3 Service area
8.3.4.24 Ext. metering (S)
In this menu you can define and set energy meters with S0 interface (x pulses / kWh). This applies to
the AC energy meters selected according to the order option in the item number list for the non-
calibration-compliant recording of the consumed energy on both the AC and DC sides. For energy
metering compliant with German calibration law, see the information in the chapter
"Equipmentcompliant with calibration law(ERK) (page 169)". Further information can also be found in
the chapter "Variants/options for thecharging station (page 20)".
Figure 8-68 External metering
You only need this area during initial commissioning and when making hardware changes to the
charging station.
Only change these settings if you have been trained accordingly.