EasyManua.ls Logo

Krone LOAD CARRIER - Page 87

Krone LOAD CARRIER
128 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SUPERSTRUCTURE OPERATION
Operating instructions • Load Carrier • 505410638-02 • 07/2019
87
Lower the lifting roof until it rests on
the adjustment bolts.
ü The lifting roof rests on the adjustment
bolts.
ü The superstructure height has been
adjusted.

Table of Contents

Related product manuals