SET‑UP 3
2SET‑UP
2.1Unpacking and setting up the vehicle
600643-01
– Remove the box and the plastic packaging.
Info
To avoid damaging the motorcycle during the setup, leave the protective foil
on the the vehicle until you have finished.
– Check the vehicle for transport damage.
– Unpack the separate enclosure and check its contents on the basis of the enclosure
list.
100303-01
– Remove the operating elements from the transport holder. Remove the screws and
handlebar clamps. Remove the transport holder.
100318-10
– Remove the M8 screw from the right hand guard.
100306-10
– Position the operating elements on the right half of the handlebar.
Info
The routing of cables and Bowden cables can be seen in the figure.
100305-10
– Position the handlebar.
The mark1 of the scale on the handlebar should be in the center of the han-
dlebar clamp.
– Position the handlebar clamps. Fit and evenly tighten the four screws.
Guideline
Screw, handlebar clamp M8 20Nm
(14.8lbfft)
Loctite
®
243™
600645-01
– Position the operating elements on the left half of the handlebar. Fit the screws.