GF8702
38
6. - Putting into service
KN142BGB G
Gyrotedder
Position the machine on level hard ground.
Tyre pressure
Check tyre pressure (Left side = Right side).
Hitch pin parallelism
• Adjust tractor lift rods so that hitch pins are
parallel to the ground.
Lateral adjustment of the lower links
- Distribute the play on each side of the lift linkage.
- Check that the stabilisers function properly
(Adjustment, Locking / Unlocking).