EasyManua.ls Logo

La Cimbali M29 Select - Installation Verification and Startup

La Cimbali M29 Select
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
English
(1
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WARNING$)7(5,167$//$7,21&+(&.726((,)7+(0$&+,1(,6:25.,1*3523(5/<VHHWKH
Installation Module C).
WARNING21&(7+(0$&+,1(+$6%((1,167$//('$1',65($'<)2586(%()25($//2:,1*
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
5. Installation Check-up
GROUPS
+RRNXSWKH¿OWHUKROGHUVWRWKHJURXSVZLWKRXWFRIIHH
Let each group dispense water for about a minute.
HOT WATER
&RQWLQXRXVO\GLVSHQVHKRWZDWHUSUHVVLQJWKHDSSURSULDWHEXWWRQXQWLODWOHDVWOLWHUVRIZDWHUKDYHEHHQXVHG
for a machine with 2 groups (see the “Hot water dispensing” Chapter in the User’s Manual).
STEAM (also with Turbosteam)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.

Table of Contents