EasyManua.ls Logo

Lainox Naboo boosted - Page 3

Lainox Naboo boosted
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
90037350rev01
- 3 -
The protocol, as outlined in the Technical Manual, is given below for testing the units after the correct installation
and connection to the power supplies.
1 Cold door Check alignment and closure of the door, insertion of cart.
“Door open” message disappears
2 Washing system Start the wash relay (if present) from service level and check
that the rotating jet is working, check the tightness of the
seals.
For liquid washes, start the pump to load the system
For solid washes, load the drawers
3 Built-in shower Check that it is working and check water-tightness and for
any possible leaks from the retractable shower, rinse any
residue from the cooking chamber
4 Boiler Activate boiler drainage from the user menu and check the
drainage valve and solenoid ll valve
5 Oven chamber fan From the service menu, check rotation of the chamber fan in
both directions
6 Seals Check the seals for the hydraulic circuits
7 Cooking Check boiler pre-heating
Operation of steam mode 100°C
Operation of combination mode 160°C
Operation of dry mode 160°C 0% humidity
Fast-dry function
Opening and tightness of seal of hot door
8 Check consumptions Check power consumption / dynamic, static supply pressure
and combustion
9 Probes Diagnostic check of values of SC, SD, SB probes and core
probe
10 Cooling Check cooling with door open and door closed, humidier
11 Cloud registration Connection to the network and new account registration on
the Cloud
TESTING PROTOCOL

Other manuals for Lainox Naboo boosted

Related product manuals