Pico rigging manual 2007.doc Page 13 of 28
5) At the outer end take the long piece of shockcord, pass it through the eye of the
hook and tie a large knot or bowline.
6) At the other end pass through another small englefield clip and tie a figure of
eight knot in the end. Now clip the two clips together. This is the tidy up line for
your clew outhaul.