EasyManua.ls Logo

LEGRAND KEOR HPE UPS - Picture 16- 12;14 Ah 12 V Battery Connection Tray Top View

LEGRAND KEOR HPE UPS
141 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and start-up of KEOR HPE UPS 60÷160 kVA
Installation et démarrage de l’ASI KEOR HPE 60÷160 kVA
Installazione e avviamento KEOR HPE UPS 60÷160 kVA
OML46086 REV. C
41
2) Install the batteries received in a separate packages and install it in accordance with the picture
15 and picture 16.
Picture 16- 12/14Ah 12V battery connection tray top view
Picture 17-12/14Ah 12V battery connection tray front view
3) After the connection re-insert the battery trays on the internal of UPS.
4) Put back and fix the left/right cover with the four screws.

Table of Contents

Related product manuals