EasyManua.ls Logo

LELY SHUTTLE XY - Connect the Sampling Device

LELY SHUTTLE XY
63 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-2 Operating Instructions
D-H021.1011EN
innovators in agriculture
5.2 Connect the Sampling Device
Preparation
CAUTION
Make sure the SHUTTLE, the sampling bottles and milk tube are clean. Clean
the SHUTTLE if it is not used for more than three days. See.
CAUTION
- Make sure the transport handle is fully in.
- Make sure the robot arm cannot hit you when you work on the SHUTTLE.
- Make sure the robot arm cannot hit the SHUTTLE.
CAUTION
- The maximum slope of the floor where the SHUTTLE is installed on must be
not more than 5°.
- The SHUTTLE must be installed in a lower position than the milk jar.
- The bleed tube must be vertical and the top must be above the 5-kg level.
1. Position the SHUTTLE in the vicinity of the milking robot.
2. Make sure the 5 kg level (1) of the milk jar is 36 cm (14.2 in) above
the floor level of the SHUTTLE (3).
3. Loosen the fasteners (11) and open the cover of the SHUTTLE.
4. Remove the cover from the sample box.
WARNING
The content of the sample box contains poisonous substances
necessary to preserve the milk samples. There is a danger of damage
to health when:
- large quantities of the preservative are inhaled
- the preservative comes in contact with the skin
- the preservative is swallowed.
5. Open the lid of each bottle to 90°.
CAUTION
Do not use a not flat or bent sample box.
6. Install the sample box in the SHUTTLE base. The sample box can
only be installed one way.
7. Install the first rack (1).
8. Install the second rack (2).
9. Make sure the lids are open and between the racks.
Note:
The cover can only by closed if the racks are correctly installed.