EasyManua.ls Logo

LEMKEN Rubin 9 U + K U - Maintenance and Repairs

LEMKEN Rubin 9 U + K U
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
84
11.3 Slotted hole for top link
If the implement is swinging during work or
uncontrolled swinging occurs, either a
deeper working depth must be chosen or it
must be worked with a higher working
speed. If this is unsuccessfull, the top link
must be connected to the slotted hole (1).
The tractor hydraulic must be set to position control and adjusted so that the top
link pin is in the middle of the slotted hole during work.
This prevents a swinging of the implement in all working situations, independently
from the working depth and the working speed.
1

Table of Contents