48
240012994 Rev. B [08/31/2020]
11.1 Beginning of Each Heating Season
Check boiler area is free from combustible materials,
gasoline, and other ammable vapors and corrosive liquids.
Visually inspect combustion air and vent piping for proper
operation. Check for and remove any obstruction to ow
of combustion air or vent gases. Immediately repair or
replace pipe showing deterioration or leakage. Reassemble
per instructions in section 6. Ensure proper reassembly and
resealing of system.
Visually inspect condensate drain line for proper operation.
Checking for deteriorated or plugged condensate drain line.
Verify condensate trap drains freely and clean as required.
Test safety relief valve for proper operation. Refer to valve
manufacturer's instructions packaged with relief valve.
Examine heat exchanger, burner, condensate lines, and
clean (if necessary) by following instructions in section 11.3
- Component Replacement And Cleaning.
CAUTION
Label all wires prior to disconnection when servicing
controls. Wiring errors can cause improper and
dangerous operation.
!!
DANGER
Before servicing, turn o electrical power to boiler at
service switch. Close manual gas valve to turn gas
supply OFF to boiler. Failure to comply will result in
death or serious injury.
!
Note
V
erify proper operation after servicing.
Note
Perform regular service and maintenance by
qualied service agency at least once every 12
months to assure safe, trouble free operation
and maximum eciency.
11 - GENERAL MAINTENANCE AND CLEANING
Circulator pump and combustion air blower motor furnished
with boiler are permanently lubricated from factory and
require no further lubrication. Lubricate eld sourced
pumps and/or motors according to pump and/or motor
manufacturer’s instruction.
Check following components are operating properly and are
free of blockages or obstructions:
air vent;
check venturi air inlet for blockage and clean as
required;
verify pressure test port cap and combustion test port
caps are in place
verify supply and return sensors are properly clipped to
pipes as close to heat exchanger as possible;
Check boiler for any sign of leaks.
Check external low water cuto operation (if installed).
Check operation by pressing test button on low water
cuto.
"Low Water" LED on the external LWCO should
illuminate and boiler should shut down.
Every 5 years remove low water cuto. Reinstall after
cleaning.
Every 10 years replace low water cuto.
Visual inspection of ame through sight glass. Burner
should be fully illuminated.
Check heating system expansion tank.
Note
A Heat Exchanger cleaning kit is available for
annual service of the boiler. See repair parts
manual for part number.

Table of Contents

Other manuals for Lennox GCWB95W-150

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lennox GCWB95W-150 and is the answer not in the manual?

Lennox GCWB95W-150 Specifications

General IconGeneral
BrandLennox
ModelGCWB95W-150
CategoryBoiler
LanguageEnglish

Related product manuals