EasyManuals Logo

Lennox GCWB95W-150 Installation Instructions

Lennox GCWB95W-150
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #50 background imageLoading...
Page #50 background image
50
240012994 Rev. B [08/31/2020]
11-1 ELECTRODES
11 - GENERAL MAINTENANCE AND CLEANING
DANGER
Before servicing, turn o electrical power to boiler at
service switch. Close manual gas valve to turn gas
supply OFF to boiler. Failure to comply will result in
death or serious injury.
!
11.4 Draining the Boiler
turn boiler o
isolate electrical supply
close boiler gas service cock
allow boiler to cool
drain boiler through onboard drain if available or
external drain valve.
11.5 Draining the Heating Circuit
Follow all steps in 11.4.
Close central heating ow and return valves.
Connect suitable pipe to drain point.
Route it to suitable container.
Open drain tap.

Table of Contents

Other manuals for Lennox GCWB95W-150

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lennox GCWB95W-150 and is the answer not in the manual?

Lennox GCWB95W-150 Specifications

General IconGeneral
BrandLennox
ModelGCWB95W-150
CategoryBoiler
LanguageEnglish

Related product manuals