EasyManua.ls Logo

Lenovo ThinkSystem DE Series - Prepare to replace DE2000 H or DE4000 H battery

Lenovo ThinkSystem DE Series
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2.
Install the rails.
If instructions were included with your rack-mounting hardware, refer to them for detailed
information on how to install the rails.
For square hole cabinets, you must first install the provided cage nuts to
secure the front and rear of the shelf with screws.
3.
Install the shelf.
An empty shelf weighs approximately 132 lb (60 kg). A mechanized lift or four
people using lift handles are required to safely move an empty shelf.
7

Other manuals for Lenovo ThinkSystem DE Series

Related product manuals