Electrical installaon
Mains connecon
If the PE conductor is not part of the supply, the PE potenal must be applied at an earthing point
near the site of installaon.
Observe the maximum permissible input voltage. Fuse the device professionally against voltage
uctuaons and voltage peaks at the input side.
Please note the following:
The controller starts as soon as the supply voltage is applied.
When the supply voltage has been switched o, the controller automacally saves the retain data
and then switches o.
Controller
GND
24E
X50
PE
0V
+24
~ =
F
L1 N
L1
N
PE
SELV/PELV
X50 Connecon Connecon type Max. terminal cross-secon
Mains connecon 24 V DC 3-pole Combicon socket
Combicon plug included in the
scope of supply
2.5 mm
2
AWG14
Electrical installaon