EasyManua.ls Logo

Lenze m500-P Series

Lenze m500-P Series
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mechanical installation
Preparation
5
21
Lenze ¯ BA 33.0008 ¯ 5.0
5.2 Preparation
Remove the corrosion protection from the shaft ends and flanges. If necessary, remove
dirt using standard cleaning solvents.
( Stop!
Bearings or seals must not come into contact with the solvent − material
damages.
After a long storage period (> 1 year) you have to check whether moisture has
entered the motor. For this purpose, measure the insulation resistance (measuring
voltage 500 V
DC
). In case of values £1kWper volt of rated voltage, dry the winding.

Table of Contents

Related product manuals