EasyManua.ls Logo

Leviton Series 2000 User Manual

Leviton Series 2000
69 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Series 1000 and Series 2000
Installation Manual
PK-93856-10-00-0B
WEB VERSION

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Leviton Series 2000 and is the answer not in the manual?

Leviton Series 2000 Specifications

General IconGeneral
BrandLeviton
ModelSeries 2000
CategoryMeasuring Instruments
LanguageEnglish

Summary

Product Description

General Description

Leviton Series 1000 and 2000 meters are self-powered, CT-rated electronic kWh meters for permanent connection to electrical service.

Meter Features

Describes revenue-grade accuracy, use with CTs, LCD display, AMR compatibility, and reverse-phase diagnostic indicator.

Meter Certifications

Lists UL listing, ANSI C12.10 compliance, and California CTEP approval for Series 2000.

Physical Description

Details the two available enclosures: industrial grade JIC steel and plastic NEMA 4X.

Technical Specifications

Electrical Specifications

Provides input configurations, voltage/current ratings, frequency, power factor, accuracy, operating temperatures, and humidity.

Input/Output Connections and User Display

Shows the terminal layout for Series 1000 and 2000 meters and refers to section 3 for hookup diagrams.

Display Specifications

Details general display information, including active energy, instantaneous and peak demand readings, and peak demand reset functionality.

Installation Instructions

Explanation of Warning Symbols

Explains the meaning of warning symbols used in the manual: consult manual, electric shock hazard, and double insulation.

Safety Precautions

Provides critical safety warnings regarding hazardous voltages, power disconnection, bonding, and adherence to codes.

Preparation for Installation

Steps to prepare for installation: verify model, consult codes, check conduit, tools, and inspect the meter/panel.

List of Materials for Installation

Lists required materials: meter, enclosure, wires, CTs, and conduit/fittings.

Mounting the Enclosure

Instructions for mounting the enclosure, including selecting a location and considering disconnect devices.

Installation of Voltage Lines

Details connecting voltage and neutral wires, routing through conduit, trimming, stripping, and tightening wires.

Installation of Current Transformers

Covers general requirements for CT installation, including splices, lead stripping, securing CTs, and phase orientation.

Testing the Installation

Covers testing voltage, the reverse phase indicator LED, load LEDs, and the LCD display after installation.

Securing the Enclosure

Instructions on how to secure the enclosure using the provided key lock for safety.

Maintenance

Troubleshooting and FAQ

Contact Information

Warranty Information

Related product manuals