EasyManua.ls Logo

Leviton 71D03 - User Manual

Leviton 71D03
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Advanced Multi-Circuit Meter 7000/7100 Series
User's Guide
Cat. Nos. 71D12, 71D48, 70D12, 70D48, 70N12, 70N48,
71D24, 70D24, 70N24, 71D03, 70D03
PK-A3259-10-00-0D
Cat. 71D24 and 71D48Cat. 71D12
Cat. 70D48
Cat. 70D12
VerifEye
®
Cat. 71D03
Cat. 70D03
Cat. 70D24
WEB VERSION
Question and Answer IconNeed help?

Do you have a question about the Leviton 71D03 and is the answer not in the manual?

Summary

Warnings and Cautions

Hazard Warnings

Critical safety warnings regarding electrocution, shock, explosion, arc flash, fire, and death.

Operational Cautions

Precautions for safe operation, including avoiding hazardous locations and using approved accessories.

Planning for Field Installation

Meter Configuration

Install Power Meter Viewer Utilities Software

Instructions for installing the essential software for meter configuration.

Connection and Configuration Options

Details on selecting connectivity methods within the Power Meter Viewer Utilities application.

USB Connection Setup

Steps for connecting the meter to a computer via USB for power and communication.

Ethernet Network Connections

Explanation of Ethernet connection requirements and options, including DHCP.

Direct Ethernet Connection

Guidance on configuring PC and meter for direct Ethernet communication.

Power Meter Viewer Utilities Software Overview

Overview of the Power Meter Viewer Utilities software's capabilities and interface.

Configure Electrical Components

Steps for configuring electrical parameters like voltage input, CT type, and service type.

Configure RS-485 Communications

Instructions for setting up RS-485 communication protocols (Modbus or BACnet).

Configure Ethernet Communications

Instructions for setting up Ethernet communication protocols (Modbus or BACnet).

Meter Installation

Meter Mounting Configurations

Describes different form factors and mounting options for VerifEye meters.

Enclosure Model Installation Sequence

Step-by-step guide for installing meters with enclosure models, including cover removal.

Wiring for Split-Phase Service Panel

Guidance on wiring a 3-wire, 1-phase split-phase service panel connection.

Wiring for 3-Phase, 4-Wire Service Panel

Guidance on wiring a 3-phase, 4-wire WYE service panel connection.

Current Transformers Basics

Criteria and guidelines for selecting and orienting current transformers (CTs).

Wiring CTs to VerifEye Meter

Diagrams and instructions for connecting CTs to the meter for various service types.

Communication and Verification

Installation Verification

Methods for verifying correct CT installation and phasing using PhaseChek and Phasor Plot.

CT Orientation Check

Techniques to check CT orientation and wattage sign for accurate readings.

RTU Programming and Scripting

Appendix B: Technical Specifications

Summary

Warnings and Cautions

Hazard Warnings

Critical safety warnings regarding electrocution, shock, explosion, arc flash, fire, and death.

Operational Cautions

Precautions for safe operation, including avoiding hazardous locations and using approved accessories.

Planning for Field Installation

Meter Configuration

Install Power Meter Viewer Utilities Software

Instructions for installing the essential software for meter configuration.

Connection and Configuration Options

Details on selecting connectivity methods within the Power Meter Viewer Utilities application.

USB Connection Setup

Steps for connecting the meter to a computer via USB for power and communication.

Ethernet Network Connections

Explanation of Ethernet connection requirements and options, including DHCP.

Direct Ethernet Connection

Guidance on configuring PC and meter for direct Ethernet communication.

Power Meter Viewer Utilities Software Overview

Overview of the Power Meter Viewer Utilities software's capabilities and interface.

Configure Electrical Components

Steps for configuring electrical parameters like voltage input, CT type, and service type.

Configure RS-485 Communications

Instructions for setting up RS-485 communication protocols (Modbus or BACnet).

Configure Ethernet Communications

Instructions for setting up Ethernet communication protocols (Modbus or BACnet).

Meter Installation

Meter Mounting Configurations

Describes different form factors and mounting options for VerifEye meters.

Enclosure Model Installation Sequence

Step-by-step guide for installing meters with enclosure models, including cover removal.

Wiring for Split-Phase Service Panel

Guidance on wiring a 3-wire, 1-phase split-phase service panel connection.

Wiring for 3-Phase, 4-Wire Service Panel

Guidance on wiring a 3-phase, 4-wire WYE service panel connection.

Current Transformers Basics

Criteria and guidelines for selecting and orienting current transformers (CTs).

Wiring CTs to VerifEye Meter

Diagrams and instructions for connecting CTs to the meter for various service types.

Communication and Verification

Installation Verification

Methods for verifying correct CT installation and phasing using PhaseChek and Phasor Plot.

CT Orientation Check

Techniques to check CT orientation and wattage sign for accurate readings.

RTU Programming and Scripting

Appendix B: Technical Specifications

Leviton 71D03 Specifications

General IconGeneral
BrandLeviton
Model71D03
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals