EasyManua.ls Logo

LG DOAS User Manual

LG DOAS
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
DEDICATED OUTDOOR AIR SYSTEM (DOAS)
INSTALLATION AND OPERATION MANUAL
Variable Refrigerant Flow DOAS Units
ARND20BDAT2
ARND20BDAR2 (no preheat)
Question and Answer IconNeed help?

Do you have a question about the LG DOAS and is the answer not in the manual?

LG DOAS Specifications

General IconGeneral
BrandLG
ModelDOAS
CategoryWireless Router
LanguageEnglish

Summary

Table Of Symbols

Safety Precautions

Roughing-In Safety

Safety guidelines for electrical work, handling, and unit installation. Includes warnings.

Power Wiring Safety

Precautions for high voltage electricity, wiring, grounding, and circuit protection.

Refrigerant Safety

Location Selection

Clearance Requirements

Specifies minimum required clearances around the unit for access and service.

Suspended Unit Mounting Details

Guidelines for properly suspending the DOAS unit for installation.

Unit Orientation and Control Component Location

Details on unit orientation and the location of control components for access.

General Installation Instructions

Receiving and Handling the Unit

Instructions for inspecting the unit upon arrival, storage, and safe handling.

Piping Guidelines

Condensate Drain Piping

Requirements and procedures for installing condensate drain traps and piping.

Refrigerant Piping

Guidelines for selecting pipe sizes, installation, brazing, and leak testing.

Piping Insulation

Instructions for insulating pipes to prevent moisture formation and ensure efficiency.

Electrical Installation

Electrical Data and Wiring

Unit electrical specifications, single-point connection, and wiring requirements.

Cutting an Electrical Opening

Procedure for safely cutting openings for conduit through the unit.

Low Voltage Communications

Outdoor/DOAS Unit Communications Cable Installation

Guidelines for installing communication cables, including routing and grounding.

Duct Connections

Wiring Diagram (ARND20BDAT2 with Preheat)

Wiring Diagram (ARND20BDAR2 without Preheat)

Unit Start-Up Procedures

Filters and Supply Fans

Initial checks for filter placement and supply fan operation.

Fan Air Flow Adjustment

Guidance on adjusting fan speed via DOAS controls for proper airflow.

Refrigerant Charge Calculation

Manual calculation of refrigerant trim charges using provided tables.

DIP Switch Settings

Instructions for setting the unit's DIP switches for application needs.

Connecting the PREMTB10U

Procedure for connecting the PREMTB10U for error code display.

Error Codes

List and explanation of possible error codes for the DOAS unit.

Connecting the JENEsys AHU Controller

Steps to connect the JENEsys AHU controller for mode determination.

Web System Interface

Overview of the web user interface for system control and monitoring.

Connecting the Web User Interface

Instructions on how to connect to the controller via a web browser.

Changing Network Connections

Details on modifying IP settings to connect the PC to the controller.

Accessing the Web User Interface

Steps to log in and navigate the web interface for system access.

Web User Interface Home Page Overview

Explanation of the main dashboard, status indicators, and navigation.

Viewing and Changing Schedules

How to create and modify unit occupancy schedules.

Holiday and Special Event Schedule

Procedure for adding special events or holidays to the schedule.

Overriding Values

How to manually override system parameters like temperature or fan status.

Web User Interface Platform Page

Managing hardware settings like IP addresses, date, and time.

Setpoints Page and Viewing Setpoints

How to view and modify system control and enable setpoints.

Timing Setpoints

Instructions for changing time-based setpoints like on/off times.

Alarms Management

Alarms Page Overview

Explanation of the alarms page layout, status, and information display.

Viewing and Acknowledging Alarms

Detailed steps to view alarm details and acknowledge active alarms.

IOs Page

IOs Page Overview

Explanation of the IOs page displaying inputs, outputs, and fault status.

Network Page Configuration

Network Page Overview

Explains network configuration options for connecting to a BMS.

Configuring the BACnet Network

Steps to enable and configure the BACnet network protocol.

BACnet MSTP Addressing

Setting up MSTP network number, address, and baud rate for BACnet.

BACnet IP Addressing

Configuration steps for BACnet communication using IP protocol.

BACnet Local Device Properties

Defining controller properties for identification on the BACnet network.

Modbus Configuration

Instructions to enable and set the address for the Modbus network.

Configuring the LonWorks Network

Steps to set up the LonWorks network, including channel ID and subnet.

Lon Device Properties Configuration

Details on configuring Lon device properties, Comm Config, and Netmgmt.

Controls Setup and Verification

Before You Begin

Pre-start-up checks for controller and I/O module security and connections.

Testing Input Values

Verifying sensor readings and input status through the web interface.

Testing Output Commands

Testing unit outputs like fans and heating/cooling stages via the web interface.

DOAS Operation Modes

Cooling Mode

Explanation of how the unit operates in cooling mode.

Heating Mode

Explanation of how the unit operates in heating mode.

Dehumidification Mode

Explanation of how the unit operates in dehumidification mode.

Ventilation Mode

Explanation of how the unit operates in ventilation mode.

Defrost Mode

Explanation of how the unit operates in defrost mode.

Maintenance Procedures

Supply Fan Lubrication

Instructions for lubricating supply fan motors and bearings.

Filter Replacement

Guidance on inspecting and replacing air filters for optimal efficiency.

Who to Call for Assistance

Related product manuals