29
TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
SEC
SEC
SEC
WALL PANEL INSTALLATION
Insert the tabs at the bottom of a Corner Wall Panel (AGL) into the holes in the slots on the front of the right, front
corner of the Floor as shown. Slide the Panel to the right. Fold the Corner Wall Panel and snap the tabs at the
bottom of the Panel down into the two slots along the right border of the Floor. If necessary, place the Wood Block
(AIW) underneath the Floor, directly below the tab to be inserted, when snapping the tabs in place.
Note: A second person should apply pressure on the opposite side of the
Wall Panels for easier insertion of the Screw. Do not overtighten Screw.
!
ADZ (x5)
AHD
ADZ
ADZ
Insert a Wall Panel (AHD) into the holes in the slots along the right side of the shed, and slide the Panel toward the
Corner Wall Panel. Ensure the top of the Panel is even with the Corner Wall Panel and the holes align. Insert
1/4” x 5/8” Pan-Head Screws (ADZ) through the holes to fasten the Panels together as shown. Do not overtighten.
*AIW (x1)
Wood Block
AGL
AIW
4
4.1
4.2