30
TOOLS AND HARDWARE REQUIRED FOR THIS PAGE
SEC
AHD
AHD
ADZ (x15)
SEC
SEC
Slide and snap another Corner Wall Panel (AGL) into place in the same manner as you did earlier. Fasten with the
required hardware. If necessary, place the Wood Block (AIW) underneath the Floor, directly below the tab to be
inserted, when snapping the tabs in place.
One at a time, insert two Wall Panels (AHD) along the rear border of the Floor. Ensure the tops are level and the
holes line up before fastening the Panels together with the required hardware.
AGL
*AIW (x1)
Wood Block
4
4.3
4.4