Lifting Column LC3 IC | 9
Installation
Before mounting/dismounting the lifting column ensure that the following points are observed:
• The lifting column is not in operation�
• The lifting column is free from loads that could be released during this work�
Before the lifting column is been put into operation, check the following:
• The lifting column is correctly mounted as indicated in the relevant user instructions�
• The equipment can be freely moved over the lifting column’s whole working area�
• The lifting column is connected to a mains electricity supply/transformer with the correct voltage, and
which is dimensioned and adapted to the lifting column in question�
• Ensure that the voltage applied matches to the voltage specified on the lifting column label�
• Ensure that the connection screws are secured safely�