EasyManua.ls Logo

Linak TECHLINE ELEVATE - LC3 IC - Installation

Linak TECHLINE ELEVATE - LC3 IC
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Lifting Column LC3 IC | 9
Installation
Before mounting/dismounting the lifting column ensure that the following points are observed:
• The lifting column is not in operation�
• The lifting column is free from loads that could be released during this work�
Before the lifting column is been put into operation, check the following:
• The lifting column is correctly mounted as indicated in the relevant user instructions�
• The equipment can be freely moved over the lifting column’s whole working area�
• The lifting column is connected to a mains electricity supply/transformer with the correct voltage, and
which is dimensioned and adapted to the lifting column in question�
• Ensure that the voltage applied matches to the voltage specified on the lifting column label�
• Ensure that the connection screws are secured safely�