EasyManua.ls Logo

Linak TECHLINE ELEVATE - LC3 IC - Electrical Installation

Linak TECHLINE ELEVATE - LC3 IC
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Lifting Column LC3 IC | 16
Electrical installation
When using soft stop on a DC motor, a short peak of high voltage will be sent back towards the power
supply� When selecting the power supply, it is important to ensure that is does not turn off the output,
when this backwards load dump occurs�
Depending of option there can be three different connectors on the LC3 IC Lifting Column:
The most left is the power connector for a 24 V DC power supply, a cab0367046-xxxx cable fits the
connector
In the middle there is a 9-pin signal connetor for controlling the LC3 IC and gathering information
regarding position and end stop signals� The cab0368543-xxxx cable that fits the connector should be
connected to a PLC or cobot controller
The connector to the most right is a RJ-45 for Modbus TCP/IP, a shielded (STP) cat 6 ethernet cable or a
cable with a category according to the requried transmission speed can be used with this connector
The ethernet cable is not supplied by LINAK
The signal connector offers access to Actuator Connect�