3
CCD-0001262
3000 Series 12V
Power Awning
LED Lights
Aftermarket Manual
(For Aftermarket Applications)
lippert.com 432-LIPPERT (432-547-7378) Rev. 09.23.24
Installing the Awning Rail
(if necessary)
NOTE: Awning rail not included.
1. Position the awning rail along the line where roof and
wall meet OR:
A. For pitched awnings: A minimum of 11" above doors or
windows
B.
windows
NOTE: The awning rail must be level and parallel with the
(Fig.1).
2. After determining the awning rail’s proper location, mark
its position with a non-permanent method of marking.
3. Seal the back of the awning rail.
4. Align the awning rail on the wall and secure with #10 x
¾" screws, using all fastener holes.
Floor Line
Front Facing View
A
B
C
B
Fig. 1
Callout
Description
A
Awning Rail
B
Support Arm Assembly
C
Roll Tube Assembly
Prior To Installation
All screws supporting the awning assembly must have a
backer within the structure of the wall of the unit. Refer to
the unit manufacturer for proper location.
Resources Required
• 1-3 People, Depending on Task
• Cordless or Electric Drill or Screw Gun
• Appropriate Drive Bits
• Rivet Gun (If Needed)
• Non-Permanent Method of Marking
• Silicone Sealant or Butyl Tape
• Screwdriver
• Silicone Lubricant