3 Installation
3.1 Connection
· Mains supply connections must comply with the national requirements regarding
medical rooms.
· Prior to connection of this apparatus to the mains supply, check that the voltage and
frequency stated on the serial number tag correspond with the available mains supply.
3.2 Connection mains cable
· Connect the supplied mains cable to the connection mains cable. ( figure 2)
· Connect the mains cable to a grounded safety socket.
3.3 Switching on and self test
· Switch on the unit using the On/Off button. (figure 2)
· Immediately after switching on, the unit carries out a self test.
· At the end of the test a beep can be heard.
Contact your supplier if this is not the case.
3.4 Checking walking surface
Before daily use of the Valiant, the belt has to be inspected on wear. By use of different
services, it is possible that the belt has to be aligned. See for alignment the chapter 5.2
Alignment of the belt.
3.5 System parameter (figure 3)
As the Valiant is delivered, all values are given in SI-units (metrical system). Switching units
is realised from the stand-by situation by pressing:
· Press Manual training [1] and Stop [4] at the same time for a minimum of 10
seconds.
· By pressing Enter [3] the next values are visible.