EasyManuals Logo

LOGICDATA SMARTneo-2-YYY-US User Manual

Default Icon
41 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
USER MANUAL SMARTneo // PAGE 17
NOTICE
While plugging in the motor cables, you must observe the se-
quence M1 and M2 without fail.
7.2 CONNECTING THE HAND CONTROL
Insert the hand control in the RJ 45 hand control bushing (HC).
7.3 CASCADING
Cascading enables, through the connection of up to two controls, the operation of up to four synchronized
drives.
NOTICE
It must be specied in advance via parameters whether a control
system is used for cascading. Minor deviations from the func-
tions of a single control are possible.
NOTICE
For additional information regarding the cascading, please refer
to the operating instructions for the cascading of motor controls.
Operating instructions are available in the download area of the
homepage www.logicdata.net
7.4 CONNECTING THE POWER SUPPLY
WARNING
Check before you connect the power supply
Before you connect the power supply cable, check again:
• whether the mains voltage complies with the
rating plate of you control
• whether all components are connected to the
correct bushings. The motor control unit SMARTneo is
operational when the power supply cable is connected.
NOTICE
Depending on the parameterisation of the motor control unit
SMARTneo, a reset or a calibration run can be necessary after the
rst connection of the power supply cable.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LOGICDATA SMARTneo-2-YYY-US and is the answer not in the manual?

LOGICDATA SMARTneo-2-YYY-US Specifications

General IconGeneral
BrandLOGICDATA
ModelSMARTneo-2-YYY-US
CategoryController
LanguageEnglish

Related product manuals