EasyManuals Logo

M2M RControl-LA User Manual

M2M RControl-LA
21 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
8102 secivreSM2M © 02
Troubleshooting
System Test
Once the wiring is done you can initiate a system test.
NOTE: Make sure the panel is disarmed and indicating a ready status.
To initiate a system test, hold the “0” button of the keypad. A sound indication from the system will
appear, indicating that you must enter a valid code in the next 20 seconds. If this is not done, the panel
will automatically exit the System Test mode.
Once this is conrmed with a valid code - the panel will send an event to the monitoring station for
entering in System Test mode. The programming icon on the keypad will be lit.
The installer must activate each of the zones that he previously congured. Every time a zone is activated
it will respond with a sound indication.
When the last zone is tested/activated the system will indicate with a sound signal that the System Test is
complete and will exit the System Test mode. A message for exiting a test mode will be send to the
monitoring station. In case the installer did not activate all the zones within 5 minutes, the alarm panel will
automatically exit the System Test mode and indicate this with a sound. The programming icon will also
be o.
If some of the sensors is not ac
tivated the system will not generate a sound indication for exiting a test
mode until this sensor is activated. The installer can manually exit the testing mode by holding the “0”
button.
In this case the system will generate a sound indication for exiting a test mode and will also send event to
the monitoring station with the zones that haven’t been tested/activated.
Periodical Test
The alarm panel can send a periodical test to the monitoring station.
This can be congured in the RControl Admin portal, section RCo
ntrol Alarm-> General Settings-> Test
Intl
Battery Test
When AC is present, the system runs battery test every 120 seconds to determine if there is a battery
connected and runs check for battery’s condition.
If the systemnds that the battery voltage is low (less than 10.8 V), a message will be send to the central
station.
AC loss – Power LED is o.
This indicates that the system is operating on battery power only. Check to see that the circuit breaker for
the branch circuit that your system’s transformer is conne
cted to has not been turned o. Instruct the user
to contact a service representative immediately if the AC power cannot be restored.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the M2M RControl-LA and is the answer not in the manual?

M2M RControl-LA Specifications

General IconGeneral
BrandM2M
ModelRControl-LA
CategorySecurity System
LanguageEnglish