EasyManua.ls Logo

MACAP LEO 55 - Operation of the Coffee Grinder; Preparation and Start Up

MACAP LEO 55
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
39
LEO 55 - LEO 55 essential
OPERATION OF THE
5 ON-DEMAND COFFEE
GRINDER
g_4.5
MACCHINA
IN
MANUTENZIONE
VIETATO
L’ACCESSO
oltre questo limite
ATTENZIONE
ORGANI
IN MOVIMENTO
ATTENZIONE
CORRENTE
ELETTRICA
MANUTENZIONE ORDINARIA
OLIARE INGRASSARE
TUTTE LE PARTI IN MOVIMENTO
OGNI 30 GG
MACCHINA
IN
MANUTENZIONE
VIETATO
L’ACCESSO
oltre questo limite
ATTENZIONE
ORGANI
IN MOVIMENTO
ATTENZIONE
CORRENTE
ELETTRICA
MANUTENZIONE ORDINARIA
OLIARE INGRASSARE
TUTTE LE PARTI IN MOVIMENTO
OGNI 30 GG
g_5.1
We assume the machine has been installed
correctly.
Remove the cover from the co󰀨ee hopper (1
- g._5.1) and insert the co󰀨ee beans. Close
the cover.
5.1 Preparation and start up
Open the co󰀨ee hopper locking slide (2 -
g._5.2), allowing the co󰀨ee beans to enter
the grinding chamber.
Place any excess cable on
the worktop, so that it can-
not be pulled by children or
cause tripping.
If the power cable is dam-
aged it is to be replaced
by the manufacturer or by
their technical assistance
service or by a person with
equivalent qualication, in
order to prevent any risks.
EN
?
?

Related product manuals