39
LEO 55 - LEO 55 essential
OPERATION OF THE
5 ON-DEMAND COFFEE
GRINDER
g_4.5
MACCHINA
IN
MANUTENZIONE
VIETATO
L’ACCESSO
oltre questo limite
ATTENZIONE
ORGANI
IN MOVIMENTO
ATTENZIONE
CORRENTE
ELETTRICA
MANUTENZIONE ORDINARIA
OLIARE INGRASSARE
TUTTE LE PARTI IN MOVIMENTO
OGNI 30 GG
MACCHINA
IN
MANUTENZIONE
VIETATO
L’ACCESSO
oltre questo limite
ATTENZIONE
ORGANI
IN MOVIMENTO
ATTENZIONE
CORRENTE
ELETTRICA
MANUTENZIONE ORDINARIA
OLIARE INGRASSARE
TUTTE LE PARTI IN MOVIMENTO
OGNI 30 GG
g_5.1
We assume the machine has been installed
correctly.
■ Remove the cover from the coee hopper (1
- g._5.1) and insert the coee beans. Close
the cover.
5.1 Preparation and start up
■ Open the coee hopper locking slide (2 -
g._5.2), allowing the coee beans to enter
the grinding chamber.
Place any excess cable on
the worktop, so that it can-
not be pulled by children or
cause tripping.
If the power cable is dam-
aged it is to be replaced
by the manufacturer or by
their technical assistance
service or by a person with
equivalent qualication, in
order to prevent any risks.
EN