Shaking Test on Lifting Carriage
In addition to the visual inspection, perform a shaking test on the lifting carriage every three
months. To do this, hold the carriage firmly by the support fork, then pull it forward making a
twisting movement.
WARNING
If the guide rollers jump out of the guide track during the shaking test, the lifting column must be
shut down until the thrust washers have been replaced.