Manitowoc F2280-21
Published 07-21-21
MLC300 Lubrication Guide
NOTE 1 Service after first 200 hours of operation is
required to remove metal particles and other
impurities collected during the initial run-in of the
gear boxes.
NOTE 2 Lower the boom to horizontal when changing the
oil in Drums 1 and 6.
NOTE 3 Travel the crawlers so the centerline through the
fill and level plugs is horizontal when changing
oil.
Item Description Required Service
After First 200 Hours of Operation
(see NOTE 1)
M1 Swing Gear Box Quick-Drain Valve (1 or 2 places) Drain and refill each with gear oil.
M2 Pump Drive Quick-Drain Valve Drain and refill with gear oil.
M3 Drum Gear Box Quick-Drain Valve (1 each drum) Drain and refill each with gear oil (see NOTE 2).
M4 Crawler Gearbox Drain Plug (1 each crawler)
(see NOTE 3)
Drain and refill each with gear oil.
Items M5-M9 Not Used