EasyManuals Logo
Home>Manitowoc>Construction Equipment>MLC300

Manitowoc MLC300 Guide

Manitowoc MLC300
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #21 background imageLoading...
Page #21 background image
Manitowoc F2280-21
Published 07-21-21
MLC300 Lubrication Guide
NOTE 1 Service after first 200 hours of operation is
required to remove metal particles and other
impurities collected during the initial run-in of the
gear boxes.
NOTE 2 Lower the boom to horizontal when changing the
oil in Drums 1 and 6.
NOTE 3 Travel the crawlers so the centerline through the
fill and level plugs is horizontal when changing
oil.
Item Description Required Service
After First 200 Hours of Operation
(see NOTE 1)
M1 Swing Gear Box Quick-Drain Valve (1 or 2 places) Drain and refill each with gear oil.
M2 Pump Drive Quick-Drain Valve Drain and refill with gear oil.
M3 Drum Gear Box Quick-Drain Valve (1 each drum) Drain and refill each with gear oil (see NOTE 2).
M4 Crawler Gearbox Drain Plug (1 each crawler)
(see NOTE 3)
Drain and refill each with gear oil.
Items M5-M9 Not Used
FOR REFERENCE
ONLY

Other manuals for Manitowoc MLC300

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc MLC300 and is the answer not in the manual?

Manitowoc MLC300 Specifications

General IconGeneral
BrandManitowoc
ModelMLC300
CategoryConstruction Equipment
LanguageEnglish

Related product manuals