EasyManuals Logo
Home>Manitowoc>Ice Maker>SM050

Manitowoc SM050 User Manual

Manitowoc SM050
236 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #198 background imageLoading...
Page #198 background image
198 Part Number 8001119 10/19
4. Apply heat to copper tubing first and move flame
toward valve socket.
A. Heat copper tubing for approximately 10 to
15 seconds then direct the heat to the
solenoid socket.
B. Heat the solenoid socket for 2 to 5 seconds
and apply silver solder to joint.
C. Do not attempt to fill solenoid flange with
solder. Solder will draw into socket.
5. Install new liquid line drier.
6. Leak check joints by pressurizing system with
150 psig nitrogen.
7. Evacuate and re-charge system to nameplate
charge.
8. Reinstall coil (using a twisting motion) and attach
wiring.
SV3071
MAX. 1300°F
(700°C)
SV3073

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc SM050 and is the answer not in the manual?

Manitowoc SM050 Specifications

General IconGeneral
BrandManitowoc
ModelSM050
CategoryIce Maker
LanguageEnglish

Related product manuals