VISIO C2H OPERATOR - INSTALLATION MANUAL
6
1.6.1
1.5
1.6
Ceiling line
i
HL Door clear height
HT = HL + 125 Overall door height
HR = HT + (5min) Minimum ceiling height
HV = HL + 28 Beam height
1.5 1.6
1.6.1
i
Check the floor level, beam and walls overhang.
FIG
1.7
Check AH for the whole opening as per Fig 2
Check that minimum HV = HL+28 for the whole
opening
1.7
1.8
1.9
5
min
Fig.
Fig.
Fig.
Fig.
Fig.
Fig.
1.4 CHECKS
DET
Fig. Fig.
Fig.
Fig.
DET
1.8
1.9
1.3.2 Door height.