EasyManua.ls Logo

Manusa Visio C2H - Page 7

Manusa Visio C2H
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DMJOIC201EN - v2
VISIO C2H OPERATOR - INSTALLATION MANUAL
7
10 mm approx.
i
Keep a distance of 10mm to the right and left of the
main profile.
Fig.
2.5
i
1. Track profile Length = AT-20mm
2. Insulation profile Length = AT-20mm
Fig. 2.4
Fig.
2.5
Fig. 2.4
2.2.2 Position. 2.2.1 Introduce.
2.2 TARCK PROFILE ASSEMBLY
i
Drill hole size Ø9 along main profile as shown in
diagrams.
Fig. 2.2 Fig. 2.1
Tools
Drill bit no.9
Fig. 2.3
Fig. 2.2
Fig. 2.1
Space drill holes
2. PREPARE MAIN PROFILE
2.1 DRILLING

Related product manuals