Masport P36-3 Gas Inbuilt 15
INSTALLATION
The P36 is approved for a 37 ft. (11.3m) straight vertical, as per the diagram 3.
The shaded area in diagram 3 shows all allowable combinations of straight
vertical and offset to vertical terminations. Maximum two 45
o
elbows allowed.
• Flue must be supported at offsets
• Maintain clearances to combustibles as listed on pages 6 to 8.
Diagram 3