Page 6
24. Lower the top fascia rail prongs into the fascia
uprights, ensuring the assembly is firmly in position
and confirming that the top rail engages in the channel
(formed in step 11) at the top front of the outer
cabinet
25. Fit two screws through the bottom of the top fascia rail into the front upstand of the firebox cabinet.
26. Remove the glass and install the embers. (See standard manual). Re-fit the glass.
27. Carry out the usual test firing procedure.
EXTERNAL INSTALLATIONS:
In the case where the enclosure is to be erected outside the house, the shielding and flue installation details above will
still apply. Suitable foundations will be required to support the weight of the enclosure and the heater, and weatherproofing
of the entire assembly will be necessary.
As before, the opening for the appliance in the wall must be 710mm wide and 735mm high with its bottom edge level
with the floor of the room. The minimum clearances to nearby side-walls and mantelshelf requirements as detailed in
Fig. 2 must be met.