7) It is advised to have sufficient clearance around the unit for proper condenser air flow and to facilitate
access for maintenance.( see clearance shown in figure below)
Delivery and Lifting
When transporting the unit, it is advisable to use forklift or crane to do this work. Only the wooden skid
base is allowed be served as the weight-supporter.
When hoisting, please keep the unit stable and without slope, meanwhile, be sure to avoid lifting ropes
contact with side heat exchanger, panel and unit’s top part.
After installation location is confirmed, remove the package base by unfastening the bolts.
Mounting
When mounting, please use foundation bolts or expansion bolts to fasten the
unit with foundation supporting legs.
It is advisable to pad the unit bottom against
vibration by using vibration absorption rubber.
350 350
900
900
Lifting Cable
<40
°
Backing Angle Protection Cushion
>8m
1,838.4074
1,415.817
Front Side
>45
°
Back Side
guiding device
>450mm
>450mm
>1000mm
>300mm
Front Side
Front Side
>450mm+h1
>450mm+h2
h2
h1
>450mm+h3
>100mm+
h4
h3
Front Side