EasyManua.ls Logo

McQuay Skyline OAC Series

McQuay Skyline OAC Series
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Installation and Maintenance Manual IM 777-4
Skyline
Air Handler
Group: Applied Air Systems
Part Number: IM 777
Date: May 2009
© 2009 McQuay International
Models OAC/OAH 003G – 090G
Question and Answer IconNeed help?

Do you have a question about the McQuay Skyline OAC Series and is the answer not in the manual?

McQuay Skyline OAC Series Specifications

General IconGeneral
Cabinet ConstructionGalvanized steel
Coil OptionsChilled water, hot water, steam, and DX
Fan TypeCentrifugal
Filter OptionsHEPA
Power Supply208-230/460V, 3-phase, 60 Hz
Insulationclosed-cell foam
Humidifier OptionsSteam or evaporative

Summary

Mechanical Installation

Service Clearances

Details required space for regular service, maintenance, and electrical power devices.

Rigging

Instructions for safely lifting and moving unit sections using factory-installed base rails.

Curb Mounting and Unit Leveling

Guidance on installing units on roof curbs or level surfaces, and preventing distortion.

Assembling Sections

Instructions for joining multiple shipping sections using splice joints and sealant.

Shipping Sections

Procedure for applying sealant to mating faces of cabinet sections for an airtight seal.

Fasten Bottom of Section

Securing bottom sections with gasket and bolts, ensuring proper drainage.

Internal Fastening

Securing sections internally using splice caps and top rail plates with bolts.

Water Cooling Coils

Specific instructions for installing water cooling coils, including glycol use and connections.

Steam Coils

Piping, coil pitching, condensate handling, and vacuum breaker installation for steam coils.

Water Heating Coils

Installation procedures and precautions for water heating coils.

Electrical Installation

Wiring

Critical safety warnings and general guidelines for electrical wiring connections.

Operation Guidelines

Startup Checks

Essential safety precautions and checks before performing startup or service.

Before Starting the Unit

A comprehensive checklist for unit installation, electrical work, and component checks.

Fan Startup

Procedure for starting the fan, checking rotation, and correcting if necessary.

Operating Limits

Crucial limits for fan speed and temperature to prevent distortion, fracture, or vibration.

Service and Maintenance

Periodic Maintenance

Schedule for checking moving parts, fasteners, and electrical connections every six months.

Ball Bearing Lubrication

Safety precautions and procedures for lubricating ball bearings using high-grade grease.

Motor Bearings

Procedure for relubricating fan motor bearings after 2000 hours of operation.

Fan Shaft Bearings

Recommended lubricants and base greases for fan shaft bearings.

VM and VP Variable Pitch Key Type Sheaves

Instructions for mounting and adjusting VM and VP variable pitch sheaves.

Service and Warranty Procedure

Check, Test, and Start Procedure Form

Quality Assurance Survey Report

Related product manuals