Do you have a question about the McQuay Vision CA Series and is the answer not in the manual?
Brand | McQuay |
---|---|
Model | Vision CA Series |
Category | Air Handlers |
Language | English |
Procedures for receiving and inspecting air handler units for damage and completeness.
Explanation of model codes and unit identification nomenclature for Vision Air Handlers.
Guidelines for storing air handling units to prevent damage and maintain integrity.
Required space around the unit for maintenance, service, and component access.
Procedures for safely rigging and lifting Vision air handler units as shipped from the factory.
Instructions for leveling the unit on its surface to prevent distortion and ensure proper drainage.
Procedures for connecting factory-shipped sections into a complete unit.
Procedures for connecting factory-shipped sections into a complete unit.
Steps to connect sections in horizontal airflow configuration.
Steps for assembling sections in vertical or inverted airflow configurations.
Procedure for joining extended coil sections to other unit components.
Method for internally fastening shipping sections together to form the unit.
Guidelines for suspending units from the ceiling using various support methods.
Procedures for removing side or top panels from the unit cabinet.
Steps to remove frame channels for improved access to unit sections.
Instructions on how to open and secure fan section access doors.
Handling and cutting procedures for panels with injected foam insulation.
Guidelines for mounting external junction boxes and components to unit panels.
Procedures for mounting face and bypass sections, especially for specific unit sizes.
Steps to assemble vertical coil sections with bypass ducts and fan sections.
Field assembly of external face and bypass duct for larger unit sizes.
Procedures for assembling multizone unit sections, including joining collars.
Steps to attach the multizone damper assembly to the unit.
Guidelines for connecting flexible ductwork to unit outlets and inlets.
Procedures for adjusting multizone dampers for proper closing and sealing.
Torque specifications for actuators on multizone, mixing box, and economizer dampers.
Guidelines for mounting actuators, ensuring proper support and avoiding stress.
General guidelines for piping design, sizing, and installation for coils.
Piping and connection details for direct expansion (DX) coils.
Installation and piping requirements for steam coils, including pitch and connections.
Guidelines for sizing and installing traps and selecting/using valves.
Guidelines for installing drain pan traps to ensure proper condensate drainage.
Adjusting internal isolation assemblies for fan and motor mounts.
Pre-operation checks to ensure the unit is properly installed and ready to run.
Recommended routine checks and maintenance tasks for the unit.
Guidelines for lubricating motor and fan shaft ball bearings.
Information regarding filter removal and installation for front-loaded options.
Using filter gauges to monitor pressure drop across installed filters.
Procedures for winterizing water coils to prevent freeze-up.
Steps for cleaning and maintaining coils for optimal performance.
General procedures for removing and replacing unit components.
Procedures for removing the fan assembly, including housing and bearings.
Methods for removing and installing various types of coils (single, stacked, staggered).
Steps to remove stacked coil configurations from the unit.
Procedures for installing stacked coil configurations into the unit.
Methods for removing and installing staggered coil configurations.
Procedure for returning defective materials for warranty claims.
Information on ordering replacement parts, including required unit details.